Roadrunner Properties Ltd v Dean
Failure to use the Act can remove contemporaneous safeguards and make later factual disputes harder.
Party Wall damage and compensation case law on causation, repair costs, mitigation, consequential loss and section 7(2).
Damage disputes require more than showing that a defect appeared after works began. These cases examine causation, the reasonable scope of repair, mitigation and the different heads of loss that may arise under section 7(2) or at common law.
Failure to use the Act can remove contemporaneous safeguards and make later factual disputes harder.
Garden-fence consent is not a substitute for proper statutory and planning procedures.
Post-work damage does not automatically make the building owner liable for curing every pre-existing defect.
s7(2) is a compensation provision requiring careful causal and quantum analysis.
A later valid statutory process can have consequences different from a unilateral attempt to impose the Act where no notice is ever served.
A later award cannot automatically absorb liability for an earlier common-law wrong.
The Act does not create a general licence to trespass or oversail.
Water ingress cases require evidence of source and causal mechanism, not assumptions based on timing.
Measure of loss depends on the actual loss and reasonableness of the proposed remedy.
Consequential compensation needs evidence; it is not automatically limited to physical repair.
s7(2) is itself capable of generating a dispute under s10.
Party-wall litigation can generate substantial collateral damages issues outside the surveyors' jurisdiction.
Damage claims may extend beyond a crack repair, but each head needs a legal and evidential basis.
Compensation provisions must be read according to who is entitled and the statutory source of the claim.
Consent is not the end of the Act if a later statutory damage/compensation dispute arises.
Compensation is not a blank cheque; reasonableness and mitigation matter.